Definition

Gaganyaan is India’s human spaceflight programme, led by ISRO, aimed at sending Indian astronauts to space and safely bringing them back to Earth.

Exam-ready points

  • ISRO describes a system of ten parachutes in four types: apex-cover separation, drogue, pilot and main.
  • Cover-separation parachutes uncover the compartment. Drogues then steady and slow the module; pilots extract the mains, which slow it further for sea landing.
  • ISRO’s 8 July 2026 report described IMAT-05 as a main-parachute qualification test associated with the uncrewed G1 mission. This is a dated test report, not a statement of today’s mission status.

Source: ISRO’s IMAT report, 8 July 2026

Common mistakes

  • Do not confuse a launch vehicle test with a crew-module recovery-system test.
  • Do not treat every Gaganyaan test as a crewed mission stage.
  • Do not forget that safe return systems are as important as launch capability in human spaceflight.

Difficulty

Foundation

Revision time

About 10 minutes

Self-check questions

  1. What role does the parachute system play during descent?
  2. How do drogue and main parachutes differ?
  3. What was IMAT-05 intended to assess in the cited report?

Answer notes

  1. It slows the module for sea landing.
  2. Drogues provide earlier stabilization and slowing; mains provide further slowing later in the sequence.
  3. The test assessed main-parachute strength and design margins under expected maximum loads for G1. It was not evidence of a crewed flight.